News Ticker-
Robotics News · Robot24.com Original

BrightMaster T100 Robot Targets Exterior Painting on High-Rise Buildings

BrightMaster's T100 is a suspended façade-coating robot rated for heights of up to 100 meters, using surface recognition and spray-path planning to automate exterior painting.

BrithMaster's Exterior Robot

BrightMaster, a Chinese construction robotics company, has presented the T100, a suspended façade-coating robot designed to automate exterior painting on high-rise buildings, a task that normally puts workers on gondolas or scaffolding at height. The company rates the system for working heights of up to 100 meters and states that it uses automatic feature recognition and spray-path planning to coat flat walls, balconies, curved surfaces and corners. 

According to BrightMaster, the T100 is modular equipment that fits standard aerial work gondolas measuring 2 to 4 meters in length, so it is added to the suspended-access arrangement already used on façade jobs and does not replace it. The company lists semi-automatic and fully automatic operating modes, together with remote monitoring, work-data recording and aerial attitude monitoring to help operators follow the process, as well as automatic obstacle crossing of up to 200 millimeters and an 80-liter material tank. Its stated working surfaces include balcony areas, bay windows and internal and external corners, which extends the intended use beyond uninterrupted flat walls. 

The coating capabilities are described in the company's technical brochure, which lists primer and topcoat application with support for latex, multicolor, relief and stone-effect finishes. BrightMaster states a work rate of 180 square meters per hour for flat gable-wall coating and 100 square meters per hour for textured-paint work, along with overall surface coverage of at least 80 percent. These figures describe different coating processes and a coverage measure for the sprayed area, not a rate for finishing an entire building, since edges, architectural details and project conditions still affect how a full façade job is organized. 

The brochure also names projects including Anhui Tianchang Bo'an, the Nansha Tanwei Village renovation and Foshan Fengtong Garden, and reports cumulative delivered work of more than 10,000 square meters. BrightMaster presents these as application examples, although the company does not give per-project details such as the building heights involved, the time taken or how much human work was still required. 

The brochure identifies its data as manufacturer-sourced and notes that delivered configurations and specifications can change, and it does not provide an independently measured productivity rate for every building layout. The wider operation also still includes suspended access, material supply, surface preparation and inspection, so the practical measure for a contractor will be the finished coating across a complete job, including the areas that need additional attention.

Free Weekly

BUSINESS NEWS WEEKLY LETTER

The Weekly Letter for Robotics Professionals, Summarizing the Most Important Industry Moves, Launches, Deals and Signals.